1. Pre-insulated Pipeline Systems
Introduction – General Information
Applied Materials
Medium-Conducting Pipeline
Insulating Layers
Outer Protective Layers
Pipeline and Fittings
PIP 130 A, B, C
PIP 180 A, B, C
PIP 210, 240, 270
PIP 300 A, B, C
Elbows, Branches, Reducers, Compensators, Fixed Points
Accessory Parts - Entries, Pipeline Ends, Expansion Cushions
Mounting Instructions for Pipeline Connection, Coupling Design
Safety Regulations
Handling, Storage
Earth Works
Thermal Losses of Distribution Systems – k-Coefficient
Heat Dilatation PIP
Solution of Heat Dilatation
Compensating Bodies L, Z, U
Heat Tensioning of Pipeline
Axial Compensators
Steam Distribution System
Installation Length, Friction Forces, Pipe Cross-Sections
Monitoring System
2. Production Assortment of the Company IZO

Planning Activity Documents

For use of pre-insulated pipelines in projects following procedures may be applied:

a) Utilization of prefabricated products for processing of the project b) Production in job-order method according to processed project c) Combination of above mentioned methods, i.e. use of prefabricated parts and detailing of atypical elements within the frame of the project

For all these methods the Company offers to customers, in addition to consultation activity, in virtue of presentation of a layout drawing and longitudinal profile the application of the IZO system, inclusive of calculation of compensating conditions, i.e. placing of compensators, fixed points, and expansion cushions. This activity is made free of charge.

For offer preparation following data are required:
- inside diameter DN
- required insulation thickness
- parameters of conducted medium
- maximum temperature
- working temperature
- temperature gradient
- maximum pressure
- length of pre-insulated pipeline
- number and dimensions of fittings, i.e. pipe bends, branches etc.
- requirement for installation of monitoring system
- special requirements, e.g. for types compensators, armatures and the like

For specific problems on pre-insulated systems PIP 180 and PIP 300 the Company reserves the right of check recalculation of compensating conditions, inclusive review of specified project solution!!!

« Handling, Storage Earth Works »